No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. MEDELLINE ARCH - 03.103.698.1-301.000 | 72,2 | 72,2 | 65,64 | Rp. 247.984.000,00 |
Rp. 247.984.000,00 |
100,0 | 75,95 | |||||||||
2 | CV. Beta Alamba Rekayasa Consult - 01.578.217.0-307.000 | 61,0 | 61,0 | ||||||||||||||
3 | CV. TATA P'SETYA - 01.516.135.9-301.000 | 66,0 | 66,0 | ||||||||||||||
4 | CV. WAHYU JAYA PERSADA - 02.780.200.8-301.000 | 72,0 | 72,0 | ||||||||||||||
5 | CV. Phitu Sima - 02.546.836.4-307.000 | Surat Izin Usaha Jasa Kontruksi (SIUJK) habis masa berlaku | |||||||||||||||
6 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | 85,0 | 85,0 | peserta tidak hadir dalam pembuktian kualifikasi | |||||||||||||
7 | CV. KOBA TEKNIK KONSULTAN - 02.671.128.3-307.000 | ||||||||||||||||
8 | PT. ABATA RENCANA KARYANUSA - 03.047.589.1-211.000 | ||||||||||||||||
9 | CV. ARDIE BW - 02.894.270.4-314.000 | ||||||||||||||||
10 | CV. DODO PROPERTY - 75.502.662.7-309.000 | ||||||||||||||||
11 | CV.MUSI PEK - 01.687.020.6-314.000 | ||||||||||||||||
12 | CV.CAHAYA PURNAMA - 71.932.179.6-314.000 | ||||||||||||||||
13 | pt. linggar jaya konsultan - 75.021.204.5-311.000 | ||||||||||||||||
14 | CV. DE AANNEMER - 02.894.343.9-314.000 | ||||||||||||||||
15 | PT. Astadipati Duta Harindo - 03.310.350.8-311.000 | ||||||||||||||||
16 | CV. DEPATI MUSI - 73.771.166.3-314.000 | ||||||||||||||||
17 | PT SRIWIJAYA KARYA TEKNIK - 02.613.050.0-307.000 | ||||||||||||||||
18 | CV. Studio Reka Teknik - 03.023.594.9-301.000 | ||||||||||||||||
19 | Swa Didri Teknik - 03.103.541.3-301.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak